What We Quantify

Construction Estimating Services by CSI Division

Our construction estimating services cover every CSI division — every takeoff is coded to CSI MasterFormat, so it drops straight into your estimate. Click any division to see exactly what we measure and what you receive.

Sitework & Civil Estimating

4 divisions

Our signature service. We build your grading plan as a real 3D surface model in Kubla Cubed — the same licensed software behind the interactive demo on our home page — and extract exact cut/fill quantities instead of averaging guesses.

What we quantify

  • Existing vs. proposed surface comparison
  • Cut & fill by cubic yard, with swell factors
  • Topsoil strip & respread quantities
  • Import / export haul-off volumes
  • Building pads, ponds & road corridors

You receive

  • Color-coded cut/fill map (PDF)
  • Full grading report with CY breakdowns
  • 3D model screenshots for your bid package
  • Excel quantity summary

Everything outside the building footprint — measured from civil and landscape sheets, coordinated with the grading model so paving quantities never double-count earthwork.

What we quantify

  • Asphalt & concrete paving by area and thickness
  • Curbs, gutters & sidewalks by linear foot
  • Base & subbase aggregate quantities
  • Fencing, gates & site furnishings
  • Planting, sod & irrigation counts

You receive

  • CSI-coded Excel takeoff (Div 32)
  • Area / LF / EA summaries by zone
  • PDF quantity summary for bid day

Pipe runs measured fitting-to-fitting from utility plans, with trench excavation and backfill calculated from pipe diameter — the quantities most estimators undercount.

What we quantify

  • Storm, sanitary, water & fire lines by LF and size
  • Manholes, catch basins & inlets by each
  • Trench excavation & bedding quantities
  • Valves, hydrants & cleanouts

You receive

  • CSI-coded Excel takeoff (Div 33)
  • Pipe schedule with LF by diameter
  • Structure count summary

Before anything gets built, something usually comes down. We quantify removals from demo plans so your bid carries the full scope — not just the new work.

What we quantify

  • Building & pavement demolition areas
  • Selective interior demolition by room
  • Clearing, grubbing & tree removal
  • Haul-off & disposal volumes

You receive

  • CSI-coded Excel takeoff (Div 02)
  • Demo area / volume summaries

Architectural Takeoff Services

9 divisions

Concrete takeoffs built from structural sheets — footings, walls and slabs measured separately, with reinforcement and formwork broken out so nothing hides in a lump sum.

What we quantify

  • Footings, grade beams & pile caps (CY)
  • Slabs on grade & elevated decks (SF/CY)
  • Walls, columns & beams
  • Rebar by ton, mesh by SF, formwork by SF

You receive

  • CSI-coded Excel takeoff (Div 03)
  • Separate material / labor quantity columns
  • Waste factors noted per item

Unit-by-unit counts from elevations — not just wall areas. Openings deducted, accessories included.

What we quantify

  • CMU block counts by size
  • Brick & stone veneer (SF)
  • Mortar, grout & reinforcement
  • Ties, flashing & control joints

You receive

  • CSI-coded Excel takeoff (Div 04)
  • Unit counts + accessory allowances

Steel tonnage from structural framing plans, member by member — plus the joists, deck and miscellaneous metals that complete the package.

What we quantify

  • Structural steel by ton (beams, columns, bracing)
  • Joists & metal decking (SF)
  • Stairs, rails & misc. metals
  • Connection allowances per spec

You receive

  • CSI-coded Excel takeoff (Div 05)
  • Tonnage summary by member type

Rough carpentry measured stick by stick where it counts — with openings, headers and hardware captured, plus finish carpentry and casework counted room by room.

What we quantify

  • Dimensional lumber & engineered wood
  • Sheathing & subfloor (SF)
  • Trusses / rafters & connectors
  • Cabinets, counters & architectural millwork

You receive

  • CSI-coded Excel takeoff (Div 06)
  • Board-foot & piece counts

The building envelope, quantified layer by layer — roof areas with penetrations deducted, and below-grade protection most bids miss.

What we quantify

  • Roofing systems by square (100 SF)
  • Insulation, air & vapor barriers
  • Waterproofing & dampproofing (SF)
  • Flashing, sealants & expansion joints

You receive

  • CSI-coded Excel takeoff (Div 07)
  • Roof area takeoffs with waste factors

Full opening schedules from the door/window sheets — every leaf, frame and hardware set counted and matched to the spec.

What we quantify

  • Doors, frames & hardware sets (EA)
  • Windows & storefront systems
  • Curtain wall & glazing (SF)
  • Overhead & specialty doors

You receive

  • CSI-coded Excel takeoff (Div 08)
  • Opening schedule cross-checked to plans

Room-by-room finish takeoffs from finish schedules and floor plans — the division where small misses multiply across every room.

What we quantify

  • Drywall & framing (SF), tape & finish levels
  • Flooring: tile, LVT, carpet, hardwood (SF)
  • Painting & wall coverings (SF)
  • Acoustical & specialty ceilings (SF)
  • Base, trim & accessories (LF)

You receive

  • CSI-coded Excel takeoff (Div 09)
  • Room finish schedule with quantities

The small-but-many items that add up — counted from plans and specs, each with its mounting and accessory.

What we quantify

  • Toilet & bath accessories (EA)
  • Signage & directories
  • Lockers, cubbies & storage specialties
  • Fire extinguishers & cabinets

You receive

  • CSI-coded Excel takeoff (Div 10)
  • Count sheets by room

Owner-furnished or contractor-installed — either way, counted and scheduled.

What we quantify

  • Window treatments (LF / EA)
  • Fixed casework & countertops
  • Furnishing counts per schedule

You receive

  • CSI-coded Excel takeoff (Div 12)

MEP Takeoff Services

6 divisions

Sprinkler counts and pipe runs from fire-protection sheets — heads by type, mains and branches by LF.

What we quantify

  • Sprinkler heads by type (EA)
  • Branch & main piping (LF by size)
  • Valves, risers & alarm devices

You receive

  • CSI-coded Excel takeoff (Div 21)

Fixture counts tied to riser diagrams, with pipe runs measured route by route — no "allowance" guessing on rough-in.

What we quantify

  • Plumbing fixtures & trim (EA)
  • DWV, water & gas piping (LF by size)
  • Water heaters & specialties
  • Insulation on piping (LF)

You receive

  • CSI-coded Excel takeoff (Div 22)
  • Fixture schedule with counts

Ductwork by the pound and the foot, equipment by the each — from mechanical plans and schedules.

What we quantify

  • RTUs, AHUs, condensers & fans (EA)
  • Ductwork (LB / LF) & fittings
  • Grilles, registers & diffusers (EA)
  • Refrigerant & hydronic piping (LF)
  • Controls points per schedule

You receive

  • CSI-coded Excel takeoff (Div 23)
  • Equipment schedule with counts

Device-by-device counts from lighting and power plans, with homeruns and feeders measured — the takeoff electricians actually want to price from.

What we quantify

  • Light fixtures & lighting controls (EA)
  • Receptacles, switches & devices (EA)
  • Conduit & wire (LF by size)
  • Panels, transformers & gear (EA)

You receive

  • CSI-coded Excel takeoff (Div 26)
  • Fixture & device schedules with counts

Low-voltage counts for the connected building — drops, devices and backbone, all scheduled.

What we quantify

  • Data / voice outlets (EA)
  • Cabling runs (LF) & pathways
  • Racks, patch panels & devices

You receive

  • CSI-coded Excel takeoff (Div 27)

Life-safety and security devices counted from risers and floor plans — every device, every panel.

What we quantify

  • Fire alarm devices & panels (EA)
  • Cameras, card readers & controllers
  • Conduit & cabling for systems (LF)

You receive

  • CSI-coded Excel takeoff (Div 28)

General Requirements Estimating

1 division

The costs most bids forget — captured from the spec's front end so your estimate carries the full project, not just the work items.

What we quantify

  • Mobilization & demobilization
  • Temporary facilities & site offices
  • Allowances & alternates per spec
  • Testing, inspections & permits

You receive

  • CSI-coded Excel takeoff (Div 01)
  • Allowance schedule extracted from specs

Need numbers on your project?

Send your plans and tell us which divisions to cover — one trade or all of them. Bid-ready numbers back in 24–48 hours.