Our construction estimating services cover every CSI division — every takeoff is coded to CSI MasterFormat, so it drops straight into your estimate. Click any division to see exactly what we measure and what you receive.
Our signature service. We build your grading plan as a real 3D surface model in Kubla Cubed — the same licensed software behind the interactive demo on our home page — and extract exact cut/fill quantities instead of averaging guesses.
Everything outside the building footprint — measured from civil and landscape sheets, coordinated with the grading model so paving quantities never double-count earthwork.
Pipe runs measured fitting-to-fitting from utility plans, with trench excavation and backfill calculated from pipe diameter — the quantities most estimators undercount.
Before anything gets built, something usually comes down. We quantify removals from demo plans so your bid carries the full scope — not just the new work.
Concrete takeoffs built from structural sheets — footings, walls and slabs measured separately, with reinforcement and formwork broken out so nothing hides in a lump sum.
Unit-by-unit counts from elevations — not just wall areas. Openings deducted, accessories included.
Steel tonnage from structural framing plans, member by member — plus the joists, deck and miscellaneous metals that complete the package.
Rough carpentry measured stick by stick where it counts — with openings, headers and hardware captured, plus finish carpentry and casework counted room by room.
The building envelope, quantified layer by layer — roof areas with penetrations deducted, and below-grade protection most bids miss.
Full opening schedules from the door/window sheets — every leaf, frame and hardware set counted and matched to the spec.
Room-by-room finish takeoffs from finish schedules and floor plans — the division where small misses multiply across every room.
The small-but-many items that add up — counted from plans and specs, each with its mounting and accessory.
Owner-furnished or contractor-installed — either way, counted and scheduled.
Sprinkler counts and pipe runs from fire-protection sheets — heads by type, mains and branches by LF.
Fixture counts tied to riser diagrams, with pipe runs measured route by route — no "allowance" guessing on rough-in.
Ductwork by the pound and the foot, equipment by the each — from mechanical plans and schedules.
Device-by-device counts from lighting and power plans, with homeruns and feeders measured — the takeoff electricians actually want to price from.
Low-voltage counts for the connected building — drops, devices and backbone, all scheduled.
Life-safety and security devices counted from risers and floor plans — every device, every panel.
The costs most bids forget — captured from the spec's front end so your estimate carries the full project, not just the work items.
Send your plans and tell us which divisions to cover — one trade or all of them. Bid-ready numbers back in 24–48 hours.